Engineers who sell transformers they'd install themselves.
We come from the test bay, not the brochure. Every rating we quote is one we've watched pass FAT — losses, temperature rise, noise and all.
From industrial plants to AI campuses.
Started in the transformer business
We began supplying distribution transformers to industrial plants — learning what fails in the field and why datasheets lie.
First data center projects
Colocation operators asked for harmonic-tolerant units with documented losses. We built our first K-factor rated range for them.
AI changes the load profile
GPU clusters brought spiky, harmonic-rich loads nobody sized for. We retooled engineering around AI load profiles and redundancy math.
Fast-track platform
Reserved factory slots and standardized ratings cut lead times from 9 months to 8–12 weeks — without skipping a single FAT test.
Powering AI campuses across EMEA
One platform: engineering, testing, logistics and commissioning for data center transformers — accountable end to end.
What we refuse to compromise.
Losses in writing
Every quote carries guaranteed no-load and load losses. If the test bay disagrees, the unit doesn't ship.
Sized for the real load
We engineer against your GPU profile — inrush, harmonics, step-loads — not against textbook averages.
One accountable team
One engineer owns your project from RFQ to energizing. No hand-offs into the void, no ticket queues.
Talk to an engineer, not a sales rep.
First call is technical: your load, your timeline, your constraints. Quote follows in 48 hours.
Bring single-line diagrams, load lists or just MW numbers on a napkin — we turn all three into ratings.